Question: Problem 2 A sofa factory works from 8 : 0 0 to 1 6 : 0 0 . They are supposed to produce 1 5
Problem
A sofa factory works from : to : They are supposed to produce sofas per day. Total operation time required for each sofas is as follow:
tableTaskTime minutesSawingFrameWeldingStuffingClothingSewing
a What is the Takt Time for the sofa factory?
b Determine the number of workers required.