Question: Problem # 2 A soil sample from a construction site having soil B has been taken to the lab. Testing yielded the following results: Mass

Problem #2
A soil sample from a construction site having soil B has been taken to the lab. Testing yielded
the following results:
Mass of soil + can before placing in oven: 339.0g
Mass of soil + can after removal from oven: 225.1g
Mass of can: 45.2g
Compute: (a) Moisture content, (b) consistency index, and (c) liquidity index
Hints: LI=wn-PL??PI, and Cl=LL-wn??PI, where wn is the natural water content of the soil.