Question: Problem # 2 A soil sample from a construction site having soil B has been taken to the lab. Testing yielded the following results: Mass
Problem #
A soil sample from a construction site having soil has been taken to the lab. Testing yielded
the following results:
Mass of soil can before placing in oven:
Mass of soil can after removal from oven:
Mass of can:
Compute: a Moisture content, b consistency index, and c liquidity index
Hints: and where is the natural water content of the soil.