Question: Problem # 2 : Average annual flows in river indus at a proposed dam site is 1 2 0 B C M . The dam

Problem # 2:
Average annual flows in river indus at a proposed dam site is 120BCM. The dam is to be built on a varying head from 50m to 100m on the turbines, estimate:
Water power potential from this proposed hydal power station if overall ef tiency of turbines is 88% and that of generator is 92%. Find the electrical energy available on the scheme in kWH per year in one year. The hydrological data suggests that avg. head available for six months is 50m, for next three months, 80m and for rest of the months is 100m.