Question: Problem # 2 : Average annual flows in river indus at a proposed dam site is 1 2 0 B C M . The dam
Problem # :
Average annual flows in river indus at a proposed dam site is The dam is to be built on a varying head from to on the turbines, estimate:
Water power potential from this proposed hydal power station if overall ef tiency of turbines is and that of generator is Find the electrical energy available on the scheme in per year in one year. The hydrological data suggests that avg. head available for six months is for next three months, and for rest of the months is
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
