Question: Problem 2 Estimate the total time and cost and the cost per cubic yard for the second balance point, sections IV and V , of

Problem 2
Estimate the total time and cost and the cost per cubic yard for the second balance
point, sections IV and V, of the mass diagram in Figure 7.9. A self loading
scraper with 20 cy loose measure capacity will be used for the excavating and
hauling.
Assume an average haul speed of 30 mph and an average return speed of 30 mph .
Use a 3 min load time and a 6 min dump time. Assume a 50 min hour
efficiency and a swell of 25%. The hourly cost of equipment and labor will be:
Scraper ,$(65.40)/(h)r
Operator ,$(21.85)/(h)r
Foreman ,$(27.20)/(h)r
Problem 2 Estimate the total time and cost and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!