Question: Problem 2 / Probleem 2 The soil profile on a site is made up of 2 m of sand and 2 1 m of homogeneous

Problem 2/ Probleem 2
The soil profile on a site is made up of 2 m of sand and 21 m of homogeneous clay. The consolidation coefficient is \( c_{v}=1.75\mathrm{~m}^{2}/\mathrm{yr}\), and the water table is at the top of the clay. The clay rests on rock that is totally impermeable to water. Construction of a large fill will cause 185 mm settlement in the top 14 m of clay and 45 mm in the bottom 7 m . Assume that the load from the fill is applied instantaneously.
a) Calculate the settlement of the clay after 15 years.
b) How long will it take for 100 mm of settlement (total for both clay layers) to occur?
c) If a thin sand layer is located at 16 m depth (14 m from the top of the clay), calculate the settlement of the clay after 15 years.
d) How long will it now take for 100 mm of settlement (total for both clay layers) to occur?
Problem 2 / Probleem 2 The soil profile on a site

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!