Question: Problem 3 : For the same two - story building, if I were to install brick ties when MC = 2 5 % and my
Problem : For the same twostory building, if I were to install brick ties
when MC and my anticipated final MC was approximately how
much vertical movement would the ties at the top of the second storey need
to accommodate? In such a building the brick veneer will be supported at
the foundation level only and simply 'tied' back to the timber frame to
ensure it does not peel away from the building due effects of wind say
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
