Question: Problem 3 : The figure below shows the soil profile and engineering properties for a site subjected to a 1 - D loading of '

Problem 3:
The figure below shows the soil profile and engineering properties for a site subjected
to a 1-D loading of 'v=10 TSM at El.+5 m .
a) Determine the final consolidation settlement using 2 layers.
b) Determine the time since start of loading )=(0 when the rate of settlement is 2.00
cm? month. Hint: since Tv0.1, use Tv=U24 to develop an equation for rate
of settlement as a function of total settlement, HDr,Cv and t .
c) If the clay had undergone two log cycles of secondary compression before being
loaded (i.e.ttp=100 and the clay is now overconsolidated), determine the new
reduced total settlement.
Note: TSM: tons per square meter
RC=Cc1+e0,RR=Cr1+e0
v=10.0TCM
+5.0?darrdarr
N.C. Clay:
RR=0.022
RC=0.295
Cv=0.25m2mon
C=0.013
t=1.70TCM
-10.0
Dense Gravel
Problem 3 : The figure below shows the soil

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!