Question: Problem 3-15 High-Low Method; Predicting Cost [LO1, LO2] Crosshill Company's total overhead costs at various levels of activity are presented below: Assume that the overhead
![Problem 3-15 High-Low Method; Predicting Cost [LO1, LO2] Crosshill Company's total](https://s3.amazonaws.com/si.experts.images/answers/2024/08/66b9b778d93c2_16066b9b77850d76.jpg)


Problem 3-15 High-Low Method; Predicting Cost [LO1, LO2] Crosshill Company's total overhead costs at various levels of activity are presented below: Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these cost 60,000-machine-hour level of activity in May is as follows: The company wants to break down the maintenance cost into its variable and fixed cost elements. Required: 1. Estimate how much of the $246,000 of overhead cost in July was maintenance cost. (Hint: To do this, first determine how mi the $246,000 consisted of utilities and supervisory salaries. Think about the behaviour of variable and fixed costs within the re range.) (Round the "Variable cost per unit" to 2 decimal places.) 3. Express the company's total overhead cost in the form Y=a+bX (Round the "Variable cost per unit" to 2 decimal p 4. What total overhead cost would you expect to be incurred at an activity level of 75,000 machine-hours? (Round the per unit" to 2 decimal places.) 2. Using the high-low method, estimate a cost formula for maintenance. (Round the "Variable cost per unir" to 2 decimal places 3. Express the company's total overhead cost in the form Y=a+bX (Round the "Variable cost per unit" to 2 decimal places.)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
