Question: Problem 4 ( 1 5 points ) Problem 2 ( 2 0 points ) Problem 2 ( 2 0 points ) Labor fluctuating needs in
Problem pointsProblem pointsProblem points
Labor fluctuating needs in construction projects can be met through hiring and end
employment. Both activities incur cost. The goal is to minimize the total cost of acquiring
needed labor force.
A contractor estimates that the size of the workforce needed over the next weeks is
and workers. Excess labor kept on the force will cost $ per worker per week, and new
hiring in any week will incur a fixed cost of $ plus $ per worker per week.
Find the optimal solution for this problem through dynamic programming. How many workers
require for each period and what is the minimum total cost?
Labor fluctuating needs in construction projects can be met through hiring and end
employment. Both activities incur cost. The goal is to minimize the total cost of acquiring
needed labor force.
A contractor estimates that the size of the workforce needed over the next weeks is
and workers. Excess labor kept on the force will cost $ per worker per week, and new
hiring in any week will incur a fixed cost of $ plus $ per worker per week.
Find the optimal solution for this problem through dynamic programming. How many workers
require for each period and what is the minimum total cost?
Cookiebaking project: the recipe provides the complete statement of work, from
which the work breakdown structure can be developed. The resources available for
this project are two cooks and one oven with limited capacity; the raw materials are the
ingredients to be used in preparing the cookie dough. As listed in following table, the
activities take a total of minutes of resource time. Because some activities can run
parallel, the cooks should complete the project in less than minutes.
Following table displays some of the planning that will save time in the project. For
example, once the oven is turned on it heats itself, freeing the cooks to perform other
activities. After the dough is mixed, both batches of cookies can be shaped; the
shaping of the second batch does not have to wait until the first batch is complete. If
both cooks are available, they can divide the dough in half and each cook can shape
one batch in the same fourminute period. However, if the second cook is not available
at this time, the project is not delayed because shaping of the second batch need not
be completed until the first batch exits the oven.
Imagine the start time is am use CPM critical path method to plan for this task.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
