Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of
bookshelf speakers and floor speakers over the next two months, with the following delivery schedule:
Model Month Month
Booshelf
Floor
Greenville estimates that the production time for each bookshelf model is hour and the production time for each floor model is hour. The
raw material costs are $ for each bookshelf model and $ for each floor model. Labor costs are $ per hour using regular production time
and $ using overtime. Greenville has up to hours of regular production time available each month and up to additional hours of
overtime available each month. If production for either cabinet exceeds demand in month the cabinets can be stored at a cost of $ per
cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to
minimize total production and storage costs. If required, round your answers to the nearest whole number. If an amount is zero, enter
Regular Time Manufacture
Model Month Month
Bookshelf
Floor
Overtime Manufacture
Model Month Month
Bookshelf
Floor
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock