Question: Problem 4 ) A clamshells will be digging a basement as shown in below assume depth was 3 m , estimate the production of medium
Problem A clamshells will be digging a basement as shown in below assume depth was estimate the production of mediumweight clamshell excavating hard clay, the heaped bucket capacity is and the cycle time is and job efficiency is Equipment costs are SR per operation hour.
A Estimate the time required to perform the excavation?
B What is the cost per bank cubic meter of excavation and total cost?