Question: Problem 4 : A project utilizing experienced drillers will require drilling and blasting of low - silica dolomite, average efficiency 5 0 - min hour.

Problem 4:
A project utilizing experienced drillers will require drilling and blasting of low-silica dolomite, average efficiency 50-min hour. No field drilling tests were conducted. It is proposed to use a 6.5-in B downhole drill at 350psi. The drills to be used have a single-pass capability of 18ft and take steel in 20-ft lengths. The blasting pattern will be a 1111-ft grid with 2ft of subdrilling. On the average, the specified finish grade is 24ft below the existing ground surface. Determine the drilling production, assuming it takes 20 min to change a 6.5-in. downhole hammer. Find the following:
1) total drill depth (ft)
2) drill time (min)
3) change steel time (min)
4) blow hole time (min)
5) move drill time (min)
6) align steel time (min)
7) change bit time (min)
8) total drill time per each hole (min)
9) operating rate (ft/min)
10) hourly production including production efficeincy (ft/hr)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!