Question: Problem 4 Please show work to receive credit: Given the following: No Inventory on Hand Routing File: Setup Minutes Lot Size Part WC 150 2

Problem 4 Please show work to receive credit:

Problem 4 Please show work to receive credit: Given the following: No Inventory on Hand Routing File: Setup Minutes Lot Size Part WC 150 2 101 30 75 B 102 25 100 C(2) 40 103 B(1) Capacity Work Center Master File: WC Minutes 101 5000 102 5000 0.9 103 5000 1.1 . What is the total run time/unit for product B. Use lot size in your calculation? . Using RCCP based on Capacity Bill with lot size considerations, what is the resource need (hours) for WC 102 in a period in which the MPS calls for 250 units of Z? . How many units of Z can be produced given the resources available? Assume all resources can be dedicated to the production of 2. Denklam 5 C Run Time Min/Unit 3 4 Ave Eff. 1.2 Bill of Materials B(3) Problem 4 Please show work to receive credit: Given the following: No Inventory on Hand Routing File: Setup Minutes Lot Size Part WC 150 2 101 30 75 B 102 25 100 C(2) 40 103 B(1) Capacity Work Center Master File: WC Minutes 101 5000 102 5000 0.9 103 5000 1.1 . What is the total run time/unit for product B. Use lot size in your calculation? . Using RCCP based on Capacity Bill with lot size considerations, what is the resource need (hours) for WC 102 in a period in which the MPS calls for 250 units of Z? . How many units of Z can be produced given the resources available? Assume all resources can be dedicated to the production of 2. Denklam 5 C Run Time Min/Unit 3 4 Ave Eff. 1.2 Bill of Materials B(3)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!