Question: Problem 4: Project Scheduling (22 points) Monohan Machinery specializes in developing weed-harvesting equipment that is used to clear small lakes of weeds. George Monohan, president

Problem 4: Project Scheduling (22 points) Monohan

Problem 4: Project Scheduling (22 points) Monohan Machinery specializes in developing weed-harvesting equipment that is used to clear small lakes of weeds. George Monohan, president of Monohan Machinery, is convinced that harvesting weeds is far better than using chemicals to kill weeds. Chemicals cause pollution, and the weeds seem to grow faster after chemicals have been used. George is contemplating the construction of a machine that would harvest weeds on narrow rivers and waterways. The activities that are necessary to build one of these experimental weed-harvesting machines are listed in the following table. ACTIVITY IMMEDIATE PREDECESSORS CE D, F a. Construct a network for these activities. (4 points) After consulting with Butch Radner, George Monohan was able to determine the activity times for constructing the weed-harvesting machine to be used on narrow rivers. The activity times are shown in the following table: ACTIVITY TIME (WEEKS) b. Determine the ES, EF, LS, and LF time, and slack for each activity. (12 points) c. Determine the total project completion time and the critical path. (6 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!