Question: Problem 4 : Site preparation and grading require the placement of 2 0 f t of new fill. An analysis of the resulting consolidation of

Problem 4: Site preparation and grading require the placement of 20ft of new fill. An analysis of the resulting consolidation of the underlying soft, saturated, compressible deposit reveals a mean consolidation settlement of 22 inch, affecting a 21.5 acre area (1 Acre (:=43,560ft2}. Prefabricated wick drains will be used to accelerate the settlement to meet the project schedule. Because of contamination from the former site use, the effluent from the wick drains will be collected and treated prior to disposal at an estimated cost of $0.25 per gallon (1cft=7.48gal. Assuming no loss of effluent during collection, the estimated treatment and disposal cost for wick drain effluent at this site is most nearly:
A) $430,000
B) $3,200,000
C) $5,200,000
D) $35,000,000
Problem 4 : Site preparation and grading require

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!