Question: PROBLEM 5 (5 points) The production manager must determine the optimal processing sequence for six jobs through two machines (M1 and M2). The same sequence

PROBLEM 5 (5 points) The production manager must

PROBLEM 5 (5 points) The production manager must determine the optimal processing sequence for six jobs through two machines (M1 and M2). The same sequence will be allowed in both departments. The manager's goal is to minimize the total completion time. Processing Time (hrs) JOB M1 M2 A 5 4 B 8 3 1 3 F 3 (a) Determine the optimal sequence using Johnson's Rule. (1 point) (b) Draw a Gantt chart with this optimal sequence and find total completion time and total idle time. (3 points) (c) Find the flow times of all the jobs on M1 and M2 using the optimal sequence. (1 point) mua hnh khu E 1036E

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!