Question: Problem 5 An excavation 2 5 - feet deep will be performed at a soft clay site where bedrock is present at a depth of

Problem 5
An excavation 25-feet deep will be performed at a soft clay site where bedrock is present at a
depth of 100-feet (i.e.,75-feet below the floor of the excavation). The slope has an angle of
26.7, and the soft clay has the following properties:
=119.2pcf,c'=380psf,'=25,Su=1800psf,CV120cm2hr
Please provide:
a) the short-term Factor of Safety of the slope.
b) the long-term Factor of Safety of the slope
c) If the excavation is performed during a period of 3 months and backfilled immediately
afterwards, what is its factor of safety, and can it be performed without triggering a deep
slope failure?
Problem 5 An excavation 2 5 - feet deep will be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!