Question: Problem 5 : Flownet for a proposed cut off wall construction work is shown below. The hydraulic conductivity of the soil is given as 0

Problem 5: Flownet for a proposed cut off wall construction work is shown below. The hydraulic conductivity of the soil is given as 0.07fmin.
a) The total length of the cut off wall is 1300 ft . The water level on downstream ground (datum level) is maintained at El 0.00 ft by running dewatering pumps. Find the number of pumps required per day if capacity of each pump is 250galmin.
Problem 5 : Flownet for a proposed cut off wall

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!