Question: Problem 6 - 1 ( Algo ) An assembly line with 1 6 tasks is to be balanced. The longest task is 2 . 6

Problem 6-1(Algo)
An assembly line with 16 tasks is to be balanced. The longest task is 2.6 minutes, and the total time for all tasks is 19 minutes. The line
will operate for 443 minutes per day.
a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)
b. What range of output is theoretically possible for the line? (Round your answers to whole numbers.)
 Problem 6-1(Algo) An assembly line with 16 tasks is to be