Question: Problem 6 ) : Multi - criteria Evaluation Four alternatives are being considered for a highway crossing over one end of an estuary including: steel

Problem 6): Multi-criteria Evaluation
Four alternatives are being considered for a highway crossing over one end of an estuary including:
steel truss bridge
concrete beam bridge
tunnel
10 km detour around water
A Delphi survey was undertaken and the key measures of effectiveness were ranked as follows:
Cost Savings 910
Construction Time Savings 410
Aesthetics ,710
Environmental Impacts ,810
Fuel Consumption Savings 310
Studies of each alternative estimate the following impacts for each alternative:
\table[[MOE,Variable,Steel Truss,Concrete Beam,Tunnel,Detour],[Savings,$ (millions),23,32,0,40],[\table[[Construction],[Time Savings]],Months,10,9,25,15],[Aesthetics,Score,3,2,10,1],[Environment,EIA Score,6,5,2,1],[Fuel Savings,litres 106,5,5,6,0]]
Determine which alternative is the preferred option based on the Delphi rankings.
Problem 6 ) : Multi - criteria Evaluation Four

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!