Problem : Multicriteria Evaluation
Four alternatives are being considered for a highway crossing over one end of an estuary including:
steel truss bridge
concrete beam bridge
tunnel
km detour around water
A Delphi survey was undertaken and the key measures of effectiveness were ranked as follows:
Cost Savings
Construction Time Savings
Aesthetics
Environmental Impacts
Fuel Consumption Savings
Studies of each alternative estimate the following impacts for each alternative:
tableMOEVariable,Steel Truss,Concrete Beam,Tunnel,DetourSavings$ millionstableConstructionTime SavingsMonths,AestheticsScore,EnvironmentEIA Score,Fuel Savings,litres
Determine which alternative is the preferred option based on the Delphi rankings.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock