Question: PROBLEM 6-5 Applying the High-Low Method and Cost Behaviour (LO2-CC9] Sawaya Co., Ltd., of Japan, is a manufacturing company whose total factory overhead costs fluctuate

 PROBLEM 6-5 Applying the High-Low Method and Cost Behaviour (LO2-CC9] Sawaya

PROBLEM 6-5 Applying the High-Low Method and Cost Behaviour (LO2-CC9] Sawaya Co., Ltd., of Japan, is a manufacturing company whose total factory overhead costs fluctuate con siderably from year to year according to increases and decreases in the number of direct labour-hours worked in the factory, Total factory overhead costs in Japanese yen, denoted 1) at high and low levels of activity for recent years are provided below: Level of Activity Low Direct labour-hours Total factory overhead costs 100,000 12,450,000 150,000 Y15.275,000 The factory overhead costs above consist of indirect materials, rent, and maintenance. The company has analyzed these costs at the 100,000-hour level of activity as follows: Indirect materials (V) Rent (F) Maintenance (M) Total factory overhead costs V = variable; F = fixed; M = mixed. * 4.200,000 5.500,000 2.750,000 912,450,000 To have data available for planning, the company wants to break the maintenance cost down into its variable and fixed cost elements. Required: 1. Estimate how much of the V15,275,000 factory overhead cost at the high level of activity consists of maintenance cost. (Hint: To do this, it may be helpful to first determine how much of the V15,275,000 consists of indirect materials and rent. Think about the behaviour of variable and fixed costs) 3. What total factory overhoved costs would you expect the company to incur at an operating level of 70,000 direct labour-hours

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!