Question: PROBLEM 7 - 1 8 Activity - Based Costing and Bidding on Jobs LO 7 - 2 , LO 7 - 3 , LO 7
PROBLEM ActivityBased Costing and Bidding on Jobs LO LO LO
Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a longsimmering dispute between the company's estimator and the work supervisors. The onsite supervisors claim that the estimators do not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and nonroutine work, such as removing asbestoscontaminated ceiling plaster in
Chapter
industrial buildings. The onsite supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $ to determine the bid price. Since our average cost is only $ per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart."
To shed light on this controversy, the company initiated an activitybased costing study of all of its costs. Data from the activitybased costing system follow:
tableActivity Cost Pool,Activity Measure,Total ActivitytableRemoving asbestosEstimating and job setupWorking on nonroutine jobsOther organizationsustainingcosts and idle capacity coststableThousands of square feetNumber of jobsNumber of nonroutine jobsNonetable thousand square feet jobs nonroutine jobs
tableCosts for the YearWages and salaries,$
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock