Question: Problem 7 - 2 0 Activity - Based Costing and Bidding on Jobs [ LO 2 , LO 3 ] Vance Asbestos Removal Company removes
Problem ActivityBased Costing and Bidding on Jobs LO LO
Vance Asbestos Removal Company removes potentially toxic asbestos insulation and related products from bulldings. The company's estimator has been involved in a longsimmering dispute with the onsite work supervisors. The onsite supervisors claim that the estimator does not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and nonroutine work, such as removing asbestoscontaminated celling plaster in industrial bulldings. The onsite supervisors belleve that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: My Job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square metres by $ per thousand square metres to determine the bid price. Since our average cost is only $ per thousand square metres, that leaves enough cushlon to take care of the additional costs of nonroutine work that shows up Besides, it is difficult to know what is routine or not routine untll you actually start tearing things apart."
To shed light on this controversy, the company initiated an ABC study of all of its costs. Data from the ABC system follow:
tableActivity cost Pool,Activity Measure,Total ActivityRemoving asbestos,Thousands of square metres,
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
