Question: Problem 9-13 Project Evaluation [LO 2] Kolbys Korndogs is looking at a new sausage system with an installed cost of $753,000. This cost will be
Problem 9-13 Project Evaluation [LO 2]
Kolbys Korndogs is looking at a new sausage system with an installed cost of $753,000. This cost will be depreciated straight-line to zero over the projects six-year life, at the end of which the sausage system can be scrapped for $96,000. The sausage system will save the firm $184,000 per year in pretax operating costs, and the system requires an initial investment in net working capital of $42,000. What is the aftertax salvage value of the equipment? (Do not round intermediate calculations and round your answer to the nearest whole number, e.g., 32.) Aftertax salvage value $ What is the annual operating cash flow? (Do not round intermediate calculations and round your answer to the nearest whole number, e.g., 32.) OCF $ If the tax rate is 35 percent and the discount rate is 7 percent, what is the NPV of this project? (Do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.) NPV $
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
