Question: Problem 9.17 (uses network only from problem 9.6; use activity times a, m, and b from problem 9.17). Draw network, tabulate results, and show calculations
Problem 9.17 (uses network only from problem 9.6; use activity times a, m, and b from problem 9.17).
Draw network, tabulate results, and show calculations - as shown in class.


9.20. The Stone River Textile Mill was inspected by OSHA and found to be in violation of a number of safety regulations. The OSHA inspectors ordered the mill to alter some existing machinery to make it safer (e.g., add safety guards); purchase some new machinery to replace older, dangerous machinery; and relocate some machinery to make safer passages and unobstructed entrances and exits. OSHA gave the mill only 35 weeks to make the changes; if the changes were not made by then, the mill would be fined $300,000. The mill determined the activities in a PERT network that would have to be completed and then estimated the indicated activity times, as shown in the table below. Construct the PERT network for this project and determine the following: a. Expected activity times b. Earliest and latest activity times and activity slack c. Critical path d. Expected project duration and variance c. Latest start and finish times d. Activity slack e. Critical path f. Expected project duration and standard deviation 9.6. Given the following network with activity times in months, determine the earliest start and finish times, latest start and finish times, and slack for each activity. Indicate the critical path and the project duration
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts