Question: Problem A new electronic equipment is going to be assembled in a production line. The Industrial Engineering Department has developed standard times based on
Problem A new electronic equipment is going to be assembled in a production line. The Industrial Engineering Department has developed standard times based on similar tasks. This information is in the table below. Task 1 Time (Minutes) 0.20 2 0.36 Predecessor 3 0.64 1 4 0.10 1,2 5 0.32 2 6 0.13 3 7 0.32 3 8 0.61 3,4 9 0.15 6,7,8 10 0.28 5,8 11 0.40 9,10 12 0.12 11 The production demand will be 120,000 units per year, 50 weeks per year, and 40 hours per week. This reduces the production of the line to 60 units per hour or one unit per minute.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts