Question: Problem C please - THANKS! A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and

Problem C please - THANKS!
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 2 units/hr 5 units/hr Assembly 0.7 units/hr Sawing Sanding Welding 2.2 units/hr Assembly 0.7 units/hr Drilling 5 units/hr Assembly 0.7 units/hr a) Sawing is the bottleneck b) The bottleneck time is 30 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is 115.74 minutes (round your response to two decimal places)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
