Question: Problem Description: Using the floor plan, building dimensions, and construction materials as specified below, determine: a ) Peak load time of the day and the
Problem Description:
Using the floor plan, building dimensions, and construction materials as specified below, determine:
a Peak load time of the day and the month
b Total cooling load of the building based on peak load time and month determined in part a
Submit your work as an excel file Term Project # Cooling Loads Calculation
Factory Building Location: Cleveland, Ohio
Use the following data:
Location: Cleveland, Ohio
Building has a CFM mechanical ventilation.
Work hours: : am : am two shifts
Number of employees per shift:
Lighting: mathrm~Wmathrmft
Inside temperature: circmathrmF
Inside the shop area there are machines with HP and machines with HP All equipment consists of a motor out, driven equipment in
Concrete slab is insulated and no edge lossgain
Walls: Heavyweight in concrete, in insulation Group B wall, Table
Windows: Double clear glass, in thickness, light color Venetian blinds, aluminum frame, ft W x ft H
Doors: frac in thick steel with mineral fiber core, ft W x ft H
Roof: Flat roof mathrmin heavyweight concrete with in insulation Roof # Table
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock