Question: Problem from textbook online tutorial (T2) - T2.5 Kristi Conlins firm in Waco, Texas, has designed an OC curve that shows a 23 chance of

  1. Problem from textbook online tutorial (T2) - T2.5 Kristi Conlins firm in Waco, Texas, has designed an OC curve that shows a 23 chance of accepting lots with a true percentage defective of 2%. Lots of 1,000 units are produced at a time, with 100 of each lot sampled randomly. What is the average outgoing quality level?
  2. A bank follows an acceptance sampling plan, where in a lot of 4000 credit accounts, a sample of 20 accounts are examined. If more than one defective account is found, the whole lot will be subjected to 100 percent inspection. Construct the OC curve for this sampling plan. Construct the AOQ curve for this plan using formula 10S-9 (page 13 of reading 2, Stevenson text), assuming defectives found during 100 percent inspection are replaced with good parts. What is the approximate AOQL?

I have to submit word file not excel file and please do not copy from other do it by own. Thank you for help

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!