Question: PROBLEM III Consider two machines: . Machine A with 1GHz clock rate. . Machine B with 2GHz clock rate Both machines implement the same instruction

 PROBLEM III Consider two machines: . Machine A with 1GHz clock

PROBLEM III Consider two machines: . Machine A with 1GHz clock rate. . Machine B with 2GHz clock rate Both machines implement the same instruction set architecture. The machines have the following speci- fications: Instruction Instruction Machine A cycles for Machine B cycles for class Arithmetic Load/Store Cond. Branch Branch frequency 40% 25% 25% 10% instruction class 1.2 1.5 instruction class 1.1 2.0 What is the overall CPI for each machine? Which machine is faster

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!