Question: Problem is to optimize production. Form the objective function, and solve with excel solver. Two operations must be completed, O 1 and O 2 O
Problem is to optimize production. Form the objective function, and solve with excel solver.
Two operations must be completed, O and O
O can be completed either on machine or machine
Machine one must make two suboperations, A and B
Setup time for A is minutes
Operation time for A is minutes
Setup time for B is minutes
Operation time for B is minutes
Machine can do operation O as a single operation
Setup time for is minutes
Operation time for is minutes
O can be completed either on machine or machine
Assume no extra transfer time from machine to machine
Assume no extra transfer time from machine to machine
Transfer time between production lines is additional minutes
I.e from machine to or from machine to
Setup time for operation is minutes
Operation time for is minutes
Setup time for operation is minutes
Operation time for is minutes
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!