Question: Problem No . 3 ( Event Scheduling time advance algorithm ) Marks 1 0 Different types of parts arrive at an automated machining center. The
Problem NoEvent Scheduling time advance algorithm
Marks
Different types of parts arrive at an automated machining center. The types of parts and their interarrival
time is random. The machining time is deterministic. However, it depends on the part type. Assuming
that the first part arrives at time when the machining center was idle:
a Perform a hand simulation using timeadvanceeventscheduling approach and stop the
simulation at minutes. Use the interarrival and machining times given in the last two
rows of the table below.
b Calculate the average queue length and the utilization of the machining center.Events are:
Arrival
Departure
Stopping event
Event Notices are:
to represent an arrival event of part to occur at future time
to represent a departure event of part to occur at future time
to represent the simulation stop event future time
Machining is accomplished with FIFO discipline parts have equal priority irrespective of their
types
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock