Question: Problem Set 1 Given the following cash flows for a capital project, calculate the Payback period, NPV, PI, IRR, and MIRR. The required rate of

Problem Set 1

Given the following cash flows for a capital project, calculate the Payback period, NPV, PI, IRR, and MIRR. The required rate of return is 8 percent.

Year CF
0 $(50,000.00)
1 $15,000.00
2 $15,000.00
3 $15,000.00
4 $15,000.00
5 $5,000.00

Please show work and also attach the excel file. Thank you. Answer needed as soon as possible. Thank you.