Question: Problem: Use the data provided below ( taken from the original study ) to conduct a simple benefit cost analysis for the dam and reservoir.

Problem:
Use the data provided below (taken from the original study) to conduct a simple benefit cost analysis for the dam and reservoir. The benefit-cost analysis is to consider a 44-year timeframe, of which the first four years are for construction.
Table 3. Summary of Meridian Project Capital Costs ($ million in 2001 dollars)
\table[[Component,Scenario 1,Scenario 2,Scenario 3],[Dam Total,812,850,926],[Hydropower,101,101,101],[Imgation,2,130,2,780,3,410],[Other infrastructure',497,766,1,027],[ElA,6.5,6.5,6.5],[Mitigation,46,46,46],[Total Cost of Projoct,3,092,4,500,5.517]]
Table 4. Summary of Meridian Project Anaual Costs ($ million in 2001 dollars)
\table[[Component,Scenario 1,Scenario 2,Scenario 3],[Dam Total,3.4,3.5,3.8],[Hydropower,1.8,1.8,1.8],[Irrigation,23.4,26.6,31.3],[Total Cost of Project,28.6,31.9,36.9]]
Table 5. Summary of Meridian Project Annual Benefits ( $ million in 2001 dollars)
\table[[Component,Scenario 1,Scenario 2,Scenario 3],[Irrigation,40,50,60],[Hydropower ?',14.2,16.1,17.9],[Recreation,2.0,2.0,2.0],[Flood Control,0.02,0.02,0.02],[Environmental Benefit ?2,5.7,6.5,7.2],[Total Benefits of Project,67.9,74.6,87.7]]
Hydrepower ecanomic besefis are entimated to be 550Mrwh
Using interest rates of 1)2% and 2)6%, conduct a benefit-cost analysis for the proposed Meridian Dam and express your solutions in tabular form.
Problem: Use the data provided below ( taken from

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!