Question: PROBLEMS 3 . 1 . An industry discharging to a POTW is required to equalize its wastewater and discharge it such that the load in

PROBLEMS
3.1. An industry discharging to a POTW is required to equalize its wastewater and discharge it such that the load in BOD/day to the treatment plant is constant over the 24h. The sewage flow is 6.47 million gald, with a BOD of 200mgl. The diurnal variation in flow is shown in Fig. P3-1. The industrial waste flow is 3.17 million gal/d, with a BOD of 1200mgl, and is constant over 10h(8 A.M. to 6 P.M.).
(a) Compute the volume of equalization (or holding) tank required.
(b) Plot the discharge curve of the industrial waste over 24h.
FIGURE P3-1
Hours of the ds
PROBLEMS 3 . 1 . An industry discharging to a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!