Question: PROCUREMENT AND CONTRACTING PLEASE READ CAREFULLY AND ANSWER CORRECTLY! Zibi has purchased a site for the integrated solid waste treatment facility complex and established five
PROCUREMENT AND CONTRACTING
PLEASE READ CAREFULLY AND ANSWER CORRECTLY!
Zibi has purchased a site for the integrated solid waste treatment facility complex and established five entrance gates to the site. Zibi (Pty) Ltd requires that a battery powered Uninterruptable Power Supply (UPS) powered by solar panels be installed at each gate.
A set of bid criteria have been designed to select the contractor. Which category(ies) of evaluation factors are these and which scoring rules is/are appropriate?
Mark the correct answers with X and use as many Xs per row as you need but if you contradict yourself, marks will be deducted.
|
| Category | Scoring Table | ||||
|
| Qualification | Critical | Differentiation | Acceptable/ Not Acceptable (Y/N) | Scale of 1 to 10 | Poor/ Mediocre/ Good |
| The capacity of the battery pack shall not be less than 400Ah | ||||||
| The bidder shall provide an accredited BBBEE certificate. Preference will be given to better ratings | ||||||
| The UPSs battery pack shall be rechargeable by solar panels | ||||||
| The mass of the UPS will not exceed 220kg, but the lighter the mass the better | ||||||
| The UPS should be housed in a protective casing | ||||||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts