Question: Product X Selling price Demand/Week Variable cost/ unit 360,36 60 83,16 Product Selling price Demand/Week Variable cost/ unit 352,8 90 100,8 Questions 1. Calculate the

Product X Selling price Demand/Week Variable cost/ unit 360,36 60 83,16 Product Selling price Demand/Week Variable cost/ unit 352,8 90 100,8 Questions 1. Calculate the load on each resource to determine the contraint 2. Calculate the most profitable product using the throughput rate of each product ( donot use cost or unit) 3. Calculate the maximum number of each product to be made considering the constraint capacity 4. Calculate the profit per week considering the constrained capacity 5. The following project is processed consisting of 2 changes which must both be implemented 5.1 reduce the time on process A - 1 by two minutes per unit 5.2 Increase the time process D- 1 by 5 minutes per uit 5.3 At a once off cost of R32430.00, should this project proposal b implemented or not? Justify D-1 7 min/unit D-2 18 min/unit C-1 8 min/unit C-2 8 min/unit B-2 11 min unit Some tips 1. there is only one constraint. If you do not find any, or more than one, you have made a mistake 2. Loads for non-contraints are between 1900 min and 2400 min 3. load on the constaint is between 2400 min and 3000 min, anything outside that range is a mistake 4. The profit is positive. If you score a loss, you have made mistake A-1 23 min/unit B-1 8 min/unit A-2 15 min\unit the use of allocated fixed cost in this assigment is forbidden and will result in a mark of zero to be scored irrespective of any other correct calculations or accidentally getting the right answer Product X Selling price Demand/Week Variable cost/ unit 360,36 60 83,16 Product Selling price Demand/Week Variable cost/ unit 352,8 90 100,8 Questions 1. Calculate the load on each resource to determine the contraint 2. Calculate the most profitable product using the throughput rate of each product ( donot use cost or unit) 3. Calculate the maximum number of each product to be made considering the constraint capacity 4. Calculate the profit per week considering the constrained capacity 5. The following project is processed consisting of 2 changes which must both be implemented 5.1 reduce the time on process A - 1 by two minutes per unit 5.2 Increase the time process D- 1 by 5 minutes per uit 5.3 At a once off cost of R32430.00, should this project proposal b implemented or not? Justify D-1 7 min/unit D-2 18 min/unit C-1 8 min/unit C-2 8 min/unit B-2 11 min unit Some tips 1. there is only one constraint. If you do not find any, or more than one, you have made a mistake 2. Loads for non-contraints are between 1900 min and 2400 min 3. load on the constaint is between 2400 min and 3000 min, anything outside that range is a mistake 4. The profit is positive. If you score a loss, you have made mistake A-1 23 min/unit B-1 8 min/unit A-2 15 min\unit the use of allocated fixed cost in this assigment is forbidden and will result in a mark of zero to be scored irrespective of any other correct calculations or accidentally getting the right
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
