Question: Project Brief Project Management Tools and Techniques 1 . 0 Construction Details The dimensions and levels of the structure are shown in the sketch shown
Project Brief
Project Management Tools and Techniques
Construction Details
The dimensions and levels of the structure are shown in the sketch shown in drawing.
The structure will be supported on load bearing mm diameter CFA piles below the base slab, on a grid similar to that indicated by the circular elements on the drawing.
Ground level is m AOD
Oversite blinding concrete is mm thick.
diameter reinforced concrete columns, which are centered on the load bearing piles above, extend through the basement.
A steel Framed structure is then constructed above using the same column spacing.
The steel frame consists of column sections x x Universal Column and beam sections h x w x Universal Beam in both directions.
Construction of reinforced concrete elements involves the following activities:
Task Rate Maximum Resources Other information
Setting out day per activity site engineer
Erect formwork m per joiner day joiners carpenters
Fix reinforcement fixer tonne per day steel fixers tonne m of concrete
Pour concrete m day gang concrete gang of workers
Strike formwork m joiner per day joiners carpenters
Also assume the following for other activities:
Task Rate Maximum Resources Other information
Mobilisation preparation for piling days
Demobilisation
after piling day
Piling piles day Includes drilling, concrete and reinforcement
Excavation m day
Structural steelwork tonne per man per day team of steel erectors
PERT Analysis recommended adjustments to activity durations
Optimistic Duration Pessimistic Duration
Activity Decrease ML duration Increase ML duration
Mobilisation Demobilisation
Foundation Piling
Labour intensive
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock