Question: Project Brief Table 1 : Project coordinates table [ [ Position number,Coordinates ] , [ A , 2 5 deg 4 4 ^

Project Brief Table 1: Project coordinates
\table[[Position number,Coordinates],[A,25\deg 44^(')23^(''S),27\deg 39^(')35^('')E],[B,25\deg 44^(')48^(''S),27\deg 39^(')41^('')E],[C,25\deg 45^(')11^(''S),27\deg 39^(')49^('')E],[D,25\deg 45^(')29^(''S),27\deg 40^(')01^('')E],[E,25\deg 45^(')42^('')S,27\deg 40^(')19^('')E],[F,25\deg 45^(')55^('')S,27\deg 40^(')37^('')E],[G,25\deg 46^(')00^(''S),27\deg 40^(')54^('')E],[H,25\deg 45^(')57^(''S),27\deg 41^(')19^(''E)],[I,25\deg 45^(')53^(''S),27\deg 41^(')48^('')E],[J,25\deg 45^(')46^(''S),27\deg 42^(')17^('')E],[\bar (K),25\deg 45^(')43^(''S),27\deg 42^(')53^('')E],[L,25\deg 45^(')37^(''S),27\deg 43^(')17^('')E],[M,25\deg 45^(')38^(''S),27\deg 43^(')46^('')E],[N,25\deg 45^(')37^(''S),27\deg 44^(')34^('')E],[O,25\deg 45^(')40^(''S),27\deg 45^(')08^('')E],[P,25\deg 45^(')50^(''S),27\deg 45^(')40^('')E],[Q,25\deg 46^(')03^('') S 27\deg 46^(')04^(''E)],[R,25\deg 46^(')33^('') S 27\deg 46^(')16^('')E],[S,25\deg 47^(')12^(''S),27\deg 46^(')20^('')E]]
1.1 Part A: Report (written assessment component)1.1 Part A: Report (written assessment component)
Perform a geological investigation plan (desktop study) for this proposed road.
Submit a report to present all your findings. The report must, at a minum, cover the
following aspects:
A signed declaration that you have performed the work on your own. A zero
mark will be awarded to all projects that do not include this signed declaration
Introduction
Site description
Climatic (Weinert area) and topographic data
Proposal on the field work that will need to be undertaken
Proposal on laboratory testing that will need to be undertaken
Occupational health and safety (OHS): A brief description of how you will
ensure that all field and laboratory work that will be carried out will comply to
currently applicable OHS legislation. List the relevant sections of legislation.
Description of the hydrology along the alignment. Identify areas where bridges
or major culverts may be required Comprehensive identification of the geology along the alignment of the road
(rock and soil types, differences in geology along the proposed alignment
(zoning)
Observations: Identify possible problem soils and list measures that can be
implemented in the design of the road to address the problem soils
Observations: Your expectations on the excavation conditions along the route,
the erodibility of materials, foundation conditions, groundwater and drainage
conditions
Identification of possible borrow/quarry areas for sourcing road construction
materials (gravels for granular pavement layers and aggregates for asphalt
production or seal construction). Therefore, investigte the various landforms
along the project alignment and discuss where you would expect to find
suitable materials
Consider the vertical and horizontal alignment of the road. A low mountain
pass will need to be constructed. Recommend investigations that will need to
be undertaken for slope stability etc.
You do not need to include a detailed environmental impact assessment, but
you must consider how road construction and quarrying will impact the
environment and what impact assessments will need to be carried out by a
qualified environmental consultant. List the relevant sections of legislation.
Conclusions and recommendations
All sources must be properly referenced
The proposed horizontal alignment of a planned new road (R576-2) is displayed in
Figure 1 below. The coordinates for some positions along the road alignment is
displayed in Table 1.
Fiaure 1: R576-2 bronosed horizontal alianment
Project Brief Table 1 : Project coordinates \

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!