Project Brief: Task Scenario
A client has requested to write a report that documents the materials specification for the design and
construction of two structural members made from concrete in a new concrete bridge structure. The
two concrete members are as follows:
Member : bridge substructure reinforced concrete piers
Member : bridge superstructure prestressed concrete girders
These two members will form part of a new concrete bridge structure that will replace an existing
concrete bridge structure in Lilyfield New South Wales, which is no longer in service. The new concrete
bridge structure will be erected using the same design as the existing concrete bridge structure but
will be wider in width to accommodate more vehicular traffic. The new concrete bridge structure will
also be exposed to the same environmental conditions as the existing concrete bridge structure.
The five stages of the Lilyfield project have been set out as follows.
A Construction design stage of Member
B Mechanical performance design stage of Member
C Serviceability criterion design stage of Member
D Durability criterion design stage of Member
E Sustainability criterion design stage of Member
Project Task
For the given project scenario and each of the five stages above perform the following tasks to
document the concrete design requirements, concrete properties, concrete mix formulations, andor
concrete material factors for the concrete to be used in each structural member.
Task : Construction design stage of Member
Focusing on the construction design stage for Member perform the following activities:
State and describe the functionality of one key design requirement taken from a standard or
specification that addresses the construction design stage
For the design requirement identified, describe one key concrete fresh property and
its trend needed in addressing the design requirement
Specific aspects that require addressing in this part of the report include:
Focus on addressing some workability related parameter for the member.
Assess how the member will be constructed in the formwork incorporating the reinforcing
steel and how this method of construction will take place onsite. For example, readymix
concrete will be placed in the formwork, onsite.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock