Question: Project Description: A soil area has been staked out at construction site, investigation probes have been inserted at the grid point locations shown in the

Project Description:
A soil area has been staked out at construction site, investigation probes have been inserted at the grid point locations shown in the figure below. Approximate soil depths have been established and are shown next to corner and intersection points. This soil needs to be removed for construction purposes.
Homework Assignment:
Calculate the volume of soil in CF to be excavated in an area having an area of 425ft300ft with soil depths as shown in the figure above.
Indicate the volume method to being used
Show the formula and calculation used
Identify the deepest and shallowest parts of the resulting excavation
List any assumptions which clarify the basis of the calculation.
Project Description: A soil area has been staked

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!