Question: Project Description The new computer - controlled conveyor belt is an exciting project that moves and positions items on the conveyor belt within < 1
Project Description
The new computercontrolled conveyor belt is an exciting project that moves and positions items on the conveyor belt within millimeter. The project will produce a new system for future installations, and for replacement of those in the field, at a low cost. The computer controlled conveyor belt has the potential to be a critical unit in percent of the systems installed in factories. The new system is also easier to update with future technologies.
The Project Priority Matrix for the Conveyor Belt Project CBP is:
Time Scope Cost
Constrain X
Enhance X
Accept X
Table A has been developed for you to use in completing the project exercises.
TABLE A
Conveyor Belt Project; WBS
Conveyor Belt Project
Hardware
Hardware specifications Hardware design Hardware documentation Prototypes Order circuit boards Assemble preproduction models
Operating system
Kernel specifications Drivers Disk drivers Serial IO drivers Memory management Operating system documentation Network interface
Utilities
Utilities specifications Routine utilities Complex utilities Utilities documentation Shell
System integration
Architectural decisions
Integration first phase System hardsoftware test Project documentation Integration acceptance testing
Assignment
Develop the WBS outline using the software available to you.
Question
Does this information WBS allow you to define any milestones of the project? Why or why not? What are they?
Remember: Save your file for future exercises!
Part
Use your file from Part and the information provided below to complete this exercise. See Table A
Each work package will represent an activity. The project begins January
The following holidays are observed: January Memorial Day last Monday in May July th Labor Day first Monday in September Thanksgiving Day th Thursday in November December and
If a holiday falls on a Saturday then Friday will be given as an extra day off, and if it falls on a Sunday, then Monday will be given as a day off.
The project teams work eighthour days, Monday through Friday.
Warning: Experience has taught students to frequently make separate backup files for each exercise. The software is never as friendly as users expect!
Construct a network schedule for the conveyor belt project and prepare a memo that addresses the following questions:
When is the project estimated to be completed? How long will the project take? What is the critical paths for the project?
Which activity has the greatest amount of slack? How sensitive is this network?
Identify two sensible milestones and explain your choices.
Compare the advantagesdisadvantages of displaying the schedule as a network versus a Gantt chart.
TABLE A Conveyor Belt Project; Schedule
Description
Architectural decisions
Harduare specifications
Kernel specifications
Uiities specifications.
Hardware design
Disk divers
Memory management
Operating system documentation
Route utes
Complex uiities
Utites documentation
Hardvare documentation
Intagraion fist phase
Prototypes
Serial U divers
System hardisoftuare test
Order circu boards.
Netvork interface
Shall
Project documentation
Assemble preproduction models
Integrated acceptance testing
Resource
Design
Development, design
Design
Development, design
Design, development
Assembly, development
Development
Design, documentation
Development
Development
Documentation, design
Documentation, design
Assembly, development
Assembly, development
Development
Assembly
Purchasing
Development
Development
Documentation, development
Assembly, development
Assembly, development
Duration days
El
El
Preceding Activity
Fag days
Note: FS refers to a FinishtoStart lag.
Include the following printouts:
A Gantt chart.
A network diagram highlighting the critical path.
A schedule table reporting ES LS EF LF and slack for each activity.
Hint: The project should be completed in days
ChatGPT
First, let's develop the Work Breakdown Structure WBS outline based on the provided information:
mathematica
Copy code
Conveyor Belt Project WBS
Project Management
Project Planning
Project Execution
Project Monitoring and Control
Project Closure
Hardware
Hardware Specifications
Hardware Design
Hardware Documentation
Prototypes
Order Circuit Boards
Assemble Preproduction Models
Operating System
Kernel Specifications
Drivers
Disk Drivers
Serial IO Drivers
Memory Management
Operating System Documentation
Network Interface
Utilities
Utilities Specifications
Routine Utilities
Complex Utilities
Utilities Documentation
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock