Question: Project Description: WSU is considering a co - generation steam turbine power plant for its electricity and hot water needs. During the weekdays, the maximum
Project Description: WSU is considering a cogeneration steam turbine power plant for its electricity and
hot water needs. During the weekdays, the maximum demand for electricity is estimated at MW The
overall system should at least contain the following components: a boiler, or turbines, an open
feed water heater, a close feed water heater, or pumps, and a condenserprocess heater for
transferring heat to the cold water. Feel free to add other components as necessary
Design Constraints:
a Efficiency of the thermal system should be higher than
b Boiler pressure should be less than MPa
c Combustion efficiency
d All pumping energy should come from the turbine work
e City water enters the condenser at and leaves the condenser at
Additional Considerations:
The power plant is turned off between AM and AM Turbines' isentropic efficiency is while the
pumping process is nearly isentropic
Deliverables for the Preliminary Report
a Design a cogeneration plant for this purpose. Draw the system block and Ts diagram of the
system. Label each term in the block diagram. List all assumptions used in this project.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock