Question: Project Risk Management (20 points) Clipper LAN Project - Clipper Systems is a small, information systems consulting firm located in beautiful Round Rock, TX. Clipper
- Project Risk Management (20 points)
Clipper LAN Project - Clipper Systems is a small, information systems consulting firm located in beautiful Round Rock, TX. Clipper Systems has just been hired to design and install a local area network (LAN) for the City of Round Rock Social Welfare Agency. You are the manager for the project, which includes one Clipper Systems professional and two interns from a local university. You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project.
Project Scope Statement
Objective: To design and install a new local area network (LAN) within one month with a budget not to exceed $ 90,000 for the Round Rock Social Service Agency with minimum disruption to ongoing operations.
Deliverables:
o 20 Workstations and 20 laptop computers
o Server with dual-core processors
o Windows R2 server and workstation operating system (Windows 7) o Migration of existing databases and programs to new system
o Four hours of introduction training for clients personnel
o 16 hours of training for client network administrator
o Fully operational LAN system
Milestones:
o Hardware by Jan 22
o Setting users priority and authorization by Jan 26
o In-house whole network test completed Feb 1
o Client site test completed Feb 2
o Training completed by Feb 16
Technical Requirements:
o Workstations with 17-inch flat panel monitors, dual-core processors, 4GB RAM, DVD +RW, wireless card, Ethernet card, 500 GB SSD.
o Laptops with 12-inch display and similar specs to workstations
o Wireless network interface cards and Ethernet Connections
o System must support Windows Vista/Windows 7 platforms
o System must provide secure external access for field workers
Constraints:
o On-site work to be done after 8 pm and before 7 am (Mon Sat)
o System maintenance and repair only up to one month after final inspection
o Warranties transferred to client
o Only responsible for installing software designated by the client
o Client will be billed for additional training beyond that prescribed in the contract
Customer Review: Director of the City of Round Rock Social Service Agency
- Identify five (5) potential risks associated with this project.
- Describe a response method for each risk and why you chose the response.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts