Question: Prototype part cost = variable. As we buy more volume, the cost per piece is lower. Prototype tooling cost = fixed Prototype build labor =
Prototype part cost = variable. As we buy more volume, the cost per piece is lower.
Prototype tooling cost = fixed
Prototype build labor = variable. Depending on the length of a build, the labor cost will differ.
Design labor cost (time required to produce a design) = variable. Depending on number of hours needed to finish a design, the overall cost per design will differ.
Knowing or estimating these project costs is essential to determine our yearly expense budgets. These budgets are tracked on a monthly basis and reported to management if we are over or under budget and how is the budget trending (up, down or neutral).
Give a response to this:
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts