Question: Provide a total cost estimate using the current traditional costing system Table 1: ABC activities, cost drivers, and cost pools Activity Activity cost driver Total

Provide a total cost estimate using the current traditional costing system

Table 1: ABC activities, cost drivers, and cost pools

Activity

Activity cost driver

Total activity cost pool

Est. cost driver usage

Production

Machine hours

$1,580,000

600,000

Materials

Lbs of materials

$620,000

230,000

Correction

DLH (trimming)

$755,000

35,000

Inspection

# of inspections

$290,000

2,000