Question: [[[Provide detailed explanations in your code as comments. Codes with no explanations will be treated as copy and marks will be deducted. Copy your codes


[[[Provide detailed explanations in your code as comments. Codes with no explanations will be treated as copy and marks will be deducted. Copy your codes with proper indentation and paste them into your report. Provide clear screenshots of your outputs.]]]
Problem 4. Design a Cricket Score Display for a T20 match with the following features: Current score, wickets, over Projected score with the current run rate Name, runs, and balls faced by both batsmen who are at the crease Name, given runs, taken wicket by the bowler Use your imagination and creativity to make it as appealing and informative as possible, Problem 5. An Electricity board charges the following rates mentioned in the table for the use of electricity. All users are charged Taka 50 as a meter charge for every month. If any user wants to change/replace his meter, he will be charged taka 2000. The monthly bill will be generated based on . . Customer Category Consumed Units Phase For Category 3 and 5 along with other parameters, you need to also consider flat rate, peak time, and off-peak time. Take input from the user, how many units were consumed during flat rate, peak, or off-peak time. Meter Charge Write a program to read the name of the user, Customer Category, Phase, number of units consumed and print out the monthly bill. Note that 5/8 Phase, flat rate, peak time and off-peak time will be appeared based on the customer category The monthly bill will be calculated following the number of Days in a month . Tariff Rate SL Customer Category and slab New Tariff Per Unit Rate (Tk.) Effective from Bill month September, 2015 Service Charge (Tk./Month) 3.33 3.80 5.14 Category A: Residential Life Line: 1-50 Units a First Step: From 00 to 75 units b Second Step: From 76 to 200 units c Third Step: From 201 to 300 units d Fourth Step: From 301 to 400 units e Fifth Step: From 401 to 600 units f Sixth Step: From 601 to above 5.36 1-Phase: 10.00 3-Phase: 30.00 5.63 8.70 9.98 2 Category B: Agricultural pumping 3.82 30.00 Category C: Small Industries a Flat Rate 7.66 3 b Off-Peak Time 6.90 70.00 c Peak Time 9.24 4 Category D: Non-Residential (Light & Power) 5.22 1-Phase: 10.00 3-Phase: 30.00 9.80 5 Category E: Commercial & Office a Flat Rate b Off-Peak Time Peak Time 8.45 1-Phase: 10.00 3-Phase: 30.00 11.98 The output shall look like this: -Check Your Electricity Bill - Enter the name of the customer: ABCD Customer Number: XXXXX 1. Monthly Bill 2. Meter Replacement 3. Main Menu 4. Exit 1 1. 2. 3. 4. 5. Residential Agricultural Pumping Small Industries Non-Residential Commercial and Office 1 a First Step: From 00 to 75 units b Second Step: From 76 to 200 units c Third Step: From 201 to 300 units d Fourth Step: From 301 to 400 units e Fifth Step: From 401 to 600 units f Sixth Step: From 601 to above Units Consumed: b a. b. 1 Phase 3 Phase a MS. ABCD XXXX Monthly Electricity Bill is ------- Taka 7/8 Thank you Please Enter your choice: 1. 2. 3. 4. Monthly Bill Meter Replacement Main Menu Exit 4 8/8
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
