As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 springnothing, and 4 clamps. The base is assembled from 1 clampnothing and 2 housings. Each clamp has 1 handle and 1 castingnothing. Each housing has 2 bearings and 1 shaftnothing. There is no inventory on hand.
Part 2
a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item.
Number
Item
I
Spring Subscript left parenthesis 1 right parenthesis
II
Housing Subscript left parenthesis 2 right parenthesis
III
Casting Subscript left parenthesis 1 right parenthesis
IV
Shaft Subscript left parenthesis 1 right parenthesis
Bracket
Base Subscript left parenthesis 1 right parenthesis
Clamp Subscript left parenthesis 1 right parenthesis
Handle Subscript left parenthesis 1 right parenthesis
Clamp Subscript left parenthesis 4 right parenthesis
Bearing Subscript left parenthesis 2 right parenthesis
Handle Subscript left parenthesis 1 right parenthesis
Casting Subscript left parenthesis 1 right parenthesis
III
I
II
IV
Part 3
b) Determine the gross quantities needed of each item if you are to assemble 75 brackets.
LOADING... Click the icon to view the completed product structure.
Base:
75 units (enter your response as a whole number).
Spring:
75 units (enter your response as a whole number).
Clamp:
375 units (enter your response as a whole number).
Housing:
150 units (enter your response as a whole number).
Handle:
375 units (enter your response as a whole number).
Casting:
375 units (enter your response as a whole number).
Bearing:
300 units (enter your response as a whole number).
Shaft:
150 units (enter your response as a whole number).
Part 4
c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock.
Base:
enter your response here units (enter your response as a whole number).
Spring:
enter your response here units (enter your response as a whole number).
Clamp:
enter your response here units (enter your response as a whole number).
Housing:
enter your response here units (enter your response as a whole number).
Handle:
enter your response here units (enter your response as a whole number).
Casting:
enter your response here units (enter your response as a whole number).
Bearing:
enter your response here units (enter your response as a whole number).
Shaft:
enter your response here units (enter your response as a whole number).

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!