Question: Q 1 ) ( 4 0 Marks ) A ) Answer the following Statements with True or false and correct the False One: ( 2
Q Marks
A Answer the following Statements with True or false and correct the False One: Marks
If it is not possible to develop a byproduct, then scrap materials should be separated to obtain top scrap prices.
Using a manufacturing process that produces components to the final shape can minimize material use, reduce scrap, minimize secondary processing.
Material Handling is only considering the transportation of materials
We should use static holds rather than dynamic motions
Design for maximum is considered the most expensive type of design.
It is recommended to begin and end motions with both hands incrementally
Industrial Engineer use operation analysis to study all Productive elements in a certain operation, and the non productive elements is not necessarily at this stage.
To elimirate an operation, Analyst should ask the following question "can we purchase this item in less cost from outside".
a Providing an ample space for each bit of information is considered one of the main points in the Tolerance and specifications steps of the operation analysis
Using the Material more cconomically means that the salvage value should not be taken into consideration when analyzing materials
The time utilized by the manufacturing process is divided into four steps: Inspection, Inventory control and planning, setup operation, and in process manufacturing
There is one type of layout that tends to be the best
Shape, texture, and size coding are used to facilitate touch identification of controls
Design for adjustability is typically implies that a specific design feature is a limiting factor in determining either the maximum or minimum value will be recommended
Decision tables are simple way to expand the evaluation of alternatives by applying numbers and forming payoff matrix.
Handle lengths of tools should be designed to be a maximum of inches.
Methods engineering Simplifies work to increase productivity and reduce cost
Work Design Fits Work to the operator to increase his productivity
Gentt Charts, gang process charts are used to select the project to be developed
In operation process chart we use only symbols operation transportation, storage, delay, and inspection
tableNoTrue,False,correction
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
