Question: Q 1 . A two - lane bridge is going to be constructed in Gundagai over Murrumbidgee River. The length of bridge is 1 4
Q
A twolane bridge is going to be constructed in Gundagai over Murrumbidgee River. The
length of bridge is m and its deepest point is m below the ground surface. Peak flood
discharges were recorded from to for Murrumbidgee River in Gundagai, NSW
Australia. The latitude and longitude of the bridge location are as follows:
Latitude: deg S
Longitude: deg E
Table : Proposed Recorded Peak Flood Discharges for Gundagai Murrumbidgee River from
to
No Year q Flow rate m s
Q Based on Flood Frequency Analysis FFA find the flood discharge in m s qmax for
the Average Recurrence Interval ARI of years.
Q Based on Rational Method determine the flood discharge in m s Q max for the
Average Recurrence Interval ARI of years. Assume the area of the catchment is
km the average slope and the mainstream length in the catchment is km The
impervious fraction of catchment area is f
Note: For the design purpose, select the flood discharge in the river in the location of the
bridge based on the maximum of these two flood discharges, calculated based on FFA and
the rational method.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
